Window Guidelines
This week has been very busy in the Theater Production 101 class. Right from the start of the semester we have been working overtime in preparation for the show “Our Town.” With little instruction many of us have simply had to jump right in, helping wherever needed. I have primarily assisted in the construction of a 4.5x10 ft cathedral window, which has been a joy to work on. The frame is all mapped out and the wood is cut and kerfed. Next: assembly and surface treatment.
No comments:
Post a Comment